Delivery:
Installation & Delivery

Delivery Charges within continental United States – Hawaii, Canada, Mexico, South America & European Countries will be quoted.
Foundation:
A) CONCRETE PIER INSTALLATION
$300.00 for 4 post holes labor & concrete. In normal soil, NO rocks (extra for rocks, add $25.00/hole).
B) CONCRETE SLAB INSTALLATION
$725.00 for 5’X5’ slab and anchors, labor & installation included. (If rocky, add $25.00/hole).
Electrical:
$400.00 electrical installation for the first 50’ to electrical breaker. Over 50’ cost is $12.00 per foot, trenching, electrical material, and labor included. TRENCHING FOR ELECTRICAL LINE IS FOR NORMAL SOIL (EXTRA CHARGE FOR ROCK TRENCHING, $45.00/HOUR). Remote On/Off Switch (optional) – $75.00
Complete Installation:
Call the Centaur office for your discounted quote on both electrical and concrete installation. LOCAL installations ONLY.
Utility Disclaimer:
Centaur is not responsible for any underground utilities during trenching or post hole installation. Repairs will be charged at time and materials.
Required for Machines:
1 – 20 AMP, (or 40 AMP for 220-V power input) dedicated circuit breaker. (Horse/Hound Walker is only system to be on breaker)
Maximum Electrical Run:
225 Feet from 20 AMPs of power.
Access Road Conditions:
Minimum 8 feet wide by 10 feet high. Must be able to enter with truck and 15’ service trailer.
Pad area for walkers must be level prior to installation. 5 feet by 5 feet must be level for placement of miniature horse walker base.
Installation charges are discussed with each individual client.
Centaur’s California contractor’s license number is: A.B. 486161.